Storm Water Master Plan for Maltese Islands
Email Story
Print This Post
- Diving Master Plan for Gozo and Comino
- Stormy October weather continues
- FAA congratulates Maltese environmentalists
- Call for Public Tenders issued for the Gozo Citadel Masterplan
- Introductory seminar on a scheme related to sustainable tourism projects
- NTM urges MEPA to continue the conservation of White Tower Bay Sand Dunes
- AD calls for transparency and accountability during projects selection process for EU funds
- New main roads officially inaugurated by the Prime Minister
- 17th century fountain in the Lunzjata valley restored
- Friends of the Earth calls for national water policy
- First phase of Mgarr to Victoria road nears completion
- Master Plan for Gozo Citadel launched
- Over 20 Million Euros for Gozitan and Maltese Farmers
- European Union Programmes Agency National Conference
- NTM welcomes Church Environment Commission statement
Email Story
Print This Post
It is envisaged that during the next period for EU Structure and Cohesion Funds (2007-2013), Malta will be engaged in a number of projects that relate to valley and storm water management.
Malta is currently undertaking the formulation of 'A Storm Water Master Plan for the Maltese Islands. This Plan is 85% part-financed by the European Union with the remaining 15% coming from local funds under the Cohesion Funds (2004-2006).
Overall objectives
In sum, the Storm water Master Plan (SWMP) is intended as an instrument to address the two paramount and juxtaposed issues of flood relief and water conservation.
Put simply, it is to "manage water away from where it is a hazard to where we are short of it" or "to transform existing threats into opportunities"
The objective of the Plan is to advance and pave the way for a common sense approach, reflected by the above mottos that can be used to brand the 'SWMP' in a meaningful way.
At a strategic level this plan is to have these overall twin objectives at the helm but it is also to integrate other wider environmental and socio-economic concerns.
Specific objectives
The objective of this contract is to formulate, on the basis of real-time analysis, a Plan that identifies priorities to be adopted as policy, and projects for their implementation; which Plan shall include with it a Final Report that sets out the results of an investigation and evaluation of the feasibility of the identified policies and actions, for: Management of the various impacts associated with storm water including flooding, road infrastructure deterioration and traffic management, civil protection and valley management in general and also with reference to particular flood prone areas and localities;
Utilisation of storm water to augment the water resources of the Maltese Islands through harvesting, storage, use, re-use, recycling, distribution of storm water and proper disposal of excess.
This project is partly financed by the EU Cohesion Funds (2004 - 2006)















You may if you wish add a comment below.